November 2020 Update

Updates
We’ve quite literally lit up the Dome in November! The arrival of the lighting was a sight to behold. Lots of colours and moving lights with difference shapes filling the dome with a spectacular display.

October 2020 Update

Updates
First water pump to be installed. This pump will automatically start pumping water in the event of a fire in the dome and provide water to the sprinkler system. The pump weigh a few ton and had to be rolled on steel pipes into the pump house with several strong men onto it’s resting place. Fire Sprinkler Systems, our contractor, conducted a water pressure test after the completion of the...

September 2020 Update

Updates
Building of Pump house that house the two pumps for the sprinkler and hose reels systems. The pumps will pumps water to these systems in an event of a fire. The walls of the pump house were built between the building and where the water tanks will be placed. The building will protect the pumps from the elements. The pump house floor was reinforced with concrete to take the weight...

August 2020 Update

Updates
    Rake Seating – The carpeting on our rake seating started in March and the final pieces were completed in July. We opted for a durable grey carpet  that will be strong enough to handle the foot traffic for years to come.     Steps for rake seating – We build 340 steps for the rake seating and covered these steps with a dark red carpet in order for the...

November 2019 Update

Updates
Windows removed and bricked up for fire escape landings in order for it to be bolted and secured in place. The old bricks are no longer available in the industry and we have to plaster the new bricked up walls. 108 bolts and nuts hold our segmented 17 long by 10 by 1,2 high meter stage together. The stage can split into different configurations or completely removed and stored. The...

New Main Stage – Faith Dome

Updates
At the Faith on Fire Conference Ps André conducted some interviews from the new main stage in Faith Dome. It is so exciting to see the hand of God at work as the completion of the next phase of the Faith Dome is imminent! Watch Faith on Fire LIVE on Facebook or any of the streams offered on the Media Page.

October 14, 2019

Updates
FAITH DOME PROJECT UPDATE October 14, 2019 The raker seats on either side of band stage has been extended, to be completed by the end of October 2019. The original plans did not have seating next to the area demarcated for the band stage. Dr André, in his vision he received from God, corrected this oversight to match his dream. He saw people sitting next to the stage and he...

24 November 2015

Updates
There are some very interesting engineering developments happening on the top floor of River Park. When you compare the photos from our last update to the most current ones, you will notice that some of the newly erected structures have been taken down again! This is not because of some mistake on the part of the engineers, but rather a better way forward on erecting the roof. The cross beams...

22 May 2015

Updates
This has really been a momentous week in the history of Faith Broadcasting Network as well as the progress of the Studio project. On Sunday 17 May we hosted Kenneth Copeland in East London for the FaithWorship Live Service. It was during the meeting that the Lord spoke prophetically through Brother Copeland to Ps André and Jenny, and by extension to the broader family and partners of Faith Broadcasting Network!...

15 May 2015 (Day#32)

Updates
213 DAYS TO STRUCTURE COMPLETION Avalon Steel Projects have made the fourth floor at River Park their second home, and every day sees their team busy with some aspect relating to the project. The old Studio A has now been totally vacated and where once before people congregated to worship there are now vehicles, construction equipment and signs of demolishing parts of the old structure. Portions of the wooden floor...

16 April 2015 (Day#4)

Updates
242 DAYS TO STRUCTURE COMPLETION After meeting with the architects and builders on 15 April 2015, an estimated completion date for the dome roof has been earmarked as 15 December 2015. This exciting development now means that together we can have a countdown and timeline in which we can see the hand of God move towards seeing this phase of the project complete! During the live Faith Connect broadcast on...